Roof Framing

The generic roof shapes for wood light frame buildings are shown in Figure 5.50. These are often combined to make roofs that are suited to the covering of more complex plan shapes and building volumes.

Figure 5.50 Basic roof shapes for wood light frame
buildings.




For structural stability, the rafters in gable and hip roofs must be securely tied together at the top of the supporting walls by well-nailed ceiling joists to make what is, in effect, a series of tri- angular trusses. If the designer wishes to eliminate the ceiling joists to expose  the sloping underside of the roof as  the finished ceiling surface, a beam or bearing wall must be inserted at the  ridge or a system of exposed horizontal  ties must be used in place of the ceiling joists. Sometimes a designer wishes  to raise the ceiling joists or exposed ties to a higher elevation than the tops of the wall plates. This greatly increases  the bending forces in the rafters and should be done only after consultation with a structural engineer.

Although a college graduate  ar  chitect or engineer would find it difficult  to lay out all the cuts of the rafters for a sloping roof using trigonometry, a  skilled carpenter, without resorting to  mathematics, has little problem making the layout if the  pitch (slope) is  specified as a ratio of rise to run. Rise is  the vertical dimension and run is the  horizontal. In the United States, pitch  is usually given on the architectÕs drawings as inches of rise per foot (12 inches) of run. A skilled carpenter uses  these two figures on the two edges of  a framing square to lay out the rafter as  shown in Figures 5.52 and 5.58. The  actual length of the rafter is never figured, nor does it need to be, because all the measurements are made as  horizontal and vertical distances with  the aid of the square. Today, many  carpenters prefer to do rafter layout  with the aid of tables that give actual  rafter lengths for various pitches and  horizontal distances; these tables are  stamped on the framing square itself  or printed in pocket-size booklets. Also available are hand-held calcula- tors that are specially programmed to find dimensions of rafters.

Hips and valleys introduce another level of trigonometric complexity  in rafter layout, but the experienced  carpenter has little difficulty  even  here: Again, he or she can use published tables for hip and valley rafters or do the layout the traditional way, as illustrated in Figure 5.56. The  head carpenter lays out only one rafter of each type by these procedures. This then becomes the  pattern rafter from which other carpenters trace  and cut the remainder of the rafters (Figure 5.59).

In areas that are subject to hurricanes, the building codes may require  that rafters be attached to their sup- porting walls with sheet metal rafter anchors. The type, size, and spacing of the nails that attach the roof sheathing to the rafters are also closely controlled.  The intent of both of these measures is to reduce the likelihood that the roof  will be blown off in high winds. Similar to requirements for bridging in floor joists, the International  Residential Code requires bridging  for ceiling joists and rafters where the  depth of these members exceeds their  thickness by a ratio of 6 to 1 based on   nominal dimensions (for conventional solid wood framing, members deeper  than 2 12 or 38 286 mm). Where  the undersides of the joists or rafters  remain unfinished, wood strapping  nailed perpendicular to the bottoms of the joists or rafters may be used instead of solid blocking or crossbracing installed between framing members.

Figure 5.52
Roof framing details and procedures: The lettered details are keyed to Figure 5.53.
The remainder of the page shows how a framing square is used to lay out a pattern rafter,
reading from the fi rst step at the lower end of the rafter to the last step at the top.
  

Figure 5.53
Step Seven: framing the attic fl oor and roof. The outer ends of attic
fl oor joists are not usually headed off, but instead are face nailed to
the rafter pairs that overlap them.
Figure 5.54
A summary of the major details for the structure shown in
Figure 5.55, aligned in relationship to one another. The gable
end studs are cut as shown in A and face nailed to the end rafter.
Figure 5.55
Step Eight: The sheathed frame is completed. The letters A,
B, and C indicate portions of the framing that are detailed in
Figure 5.54.
Figure 5.56
Framing for a hip roof. The diffi  cult
geometric problem of laying out the
diagonal hip rafter is solved easily by
using the framing square in the manner
shown. Toward the bottom of the rafter
shown in the lower part of this fi  gure
is a birdsmouth cut, an angled notch in
the rafter that allows the rafter to seat
securely on the top plate of the wall.

Figure 5.57
Framing for an overhanging rake.

Figure 5.58
A framing square being used to mark
rafter cuts. The run of the roof,
12 inches, is aligned with the edge of the
rafter on the blade (the wider leg) of a
square, and the rise, 7 inches in this case,
is aligned on the tongue (the narrower
leg) of the square. A pencil line along
the tongue will be perfectly vertical (a
plumb cut) when the rafter is installed in
the roof, and one along the blade will be
horizontal (a level cut). True horizontal
and vertical distances can be measured
on the blade and tongue, respectively.
The layout of these types of cuts can also
be seen in Figures 5.52 and 5.56.

Figure 5.59
Tracing a pattern rafter to mark cuts for
the rest of the rafters. The corner of
the building behind the carpenters has
let-in corner braces on both fl oors, and
most of the rafters are already installed.

WALL FRAMING, SHEATHING, AND BRACING

Wall framing, like floor framing, is laid out in such a way that a framing member, in this case a stud, occurs under each vertical joint between sheathing panels (Figures 5.29-5.32). The  lead carpenter initiates wall framing by laying out the stud locations on the  top plate and sole plate of each wall. Other carpenters follow behind to cut the studs and headers and assemble the walls in a horizontal position  on the subfloor. As each wall frame is completed, it is tilted up and nailed into position, with temporary bracing  as needed (Figures 5.34-5.37).

Figure 5.29 Typical ground-floor
wall framing details,
keyed by letter to
Figure 5.30.


Figure 5.30 Step Four in erecting a platform frame building:
The ground-floor walls are framed. The letters A,
B, and C indicate portions of the framing that are
detailed in Figure 5.29.
Figure 5.31 Framing details for nonloadbearing interior
partitions.

Figure 5.32
Steps in the framing of a typical wall and details at wall intersections and a
window opening. In D, the short studs above the header and below the rough
sill are called trimmer or cripple studs.
Figure 5.33 As the fi rst step in constructing a wall
frame, the chief carpenter aligns the
top plate and sole plate side by side on
the floor platform and marks each stud
location on both of them simultaneously
with a pencil and framing square.



Figure 5.34 Nailing studs to a plate, using a pneu-
matic nail gun. The triple studs are for
a partition intersection.
Figure 5.35
Tilting an interior partition into position.
The gap in the upper top plate will
receive the projecting end of the upper
top plate from another partition that
intersects at this point.


Figure 5.36
Fastening a wall to the floor platform.
Horizontal blocking between studs as
seen toward the left in this photo is
typically installed to provide a solid
substrate for the later attachment of
bathroom hardware, exterior panels,
or any number of possible other items.

Figure 5.37
Lower-level wall framing is held up by
temporary diagonal bracing until the floor joist framing is in place above and
wall bracing or sheathing is complete,
after which the frame becomes
completely self-bracing. The outer
walls of this building are framed with
2 x 6 (38 x 140 mm) studs to allow for a
greater thickness of thermal insulation,
whereas the interior partitions are made
of 2 x 4 (38 x 89 mm) stock.

Figure 5.38
Prefabricated shear wall panels are
especially useful in garage wall framing
or other walls with large openings where
only narrow, solid sections of wall
remain to resist lateral forces. They may
be made of all wood components or,
where even greater strength is required,
of wood and metal, as shown here.
The corrugated galvanized steel in this
panel is over 1/ 8  inch (3.5 mm) thick,
and the panel’s capacity to resist lateral
forces is several times greater than that
of comparable all-wood prefabricated
panels. The bottom of the panel will be
anchored with bolts embedded 21 inches
(533 mm) or more into the concrete
foundation, and the sides and top will
be screw-fastened to the surrounding
wood framing. Holes in the panel can
accommodate wiring runs within the
wall.


Long studs for tall walls often must be larger than a 2 X 4 in order  to resist wind forces. Because long  pieces of sawn dimension lumber tend not to be straight and may be less  readily available, studs manufactured  of structural composite lumber may  be used instead. The International Residential Code requires horizontal  wood blocking to be installed between studs at midheight in wall frames that are taller than 10 feet (3 m). The purpose of this blocking is to stop off the cavities between studs to restrict the  spread of fire.

Headers over window and door openings must be sized in accordance  with building code criteria. Typically,  a wall opening header consists of two nominal 2-inch members standing on  edge, separated by a plywood spacer  that serves to make the header as  thick as the depth of the wall studs.  Headers for long spans and/or heavy loads are often made of laminated  veneer lumber or parallel strand lumber, either of which is stronger and stiffer than dimension lumber. Several manufacturers market prefabri- cated headers that include thermal insulation as a way of reducing the heat loss that occurs through these difficult-to-insulate assemblies. At either end, headers rest on shortened studs called trimmer or jack studs, which  themselves are nailed to full-height king studs. At the bottom of a window  opening, the  rough sill is supported  on cripple studs (Figure 5.32).

Each corner and partition intersection must furnish nailing surfaces for the edge of each plane of exterior  and interior finish materials. This requires a minimum of three studs  at each intersection, unless special  metal clips are used to reduce the number to two (Figure 5.32).

Sheathing was originally made of solid boards, usually 6 to 10 inches  (150 to 250 mm) wide. If applied  horizontally, these boards did little  to brace the building against wracking caused by the forces of wind or
earthquake. If applied on a diagonal, however, they produced a rigid frame. Today, walls are sheathed with  either plywood or OSB, which provide permanent, very stiff bracing, or with let-in bracing  as described below. Panels are applied as soon as possible after the wall  is framed, often while it is still lying on the floor platform.

In regions of strong winds or earthquakes, wall sheathing plays  a very important part in the lateral stability the structure. A properly sheathed wall acts as a  shear wall to  resist lateral forces. Both interior and  exterior walls can act as shear walls,  which must be provided in both east west and north-south orientations  and must be distributed more or less symmetrically in the floor plan. Stresses within shear walls are proportional  to their length, with shorter walls being subjected to higher stresses than those that are longer. Where walls have large openings for windows or doors, the remaining solid portions  that can contribute to lateral force resistance may become relatively short and therefore exposed to very  high stresses. In such cases, sheathing may have to be attached with  larger nails at very close spacings, the  horizontal edges of sheathing panels  may have to be supported by wood  blocking to keep them from buckling, and studs over which sheathing panels join may need to be larger in  size, such as 3 x or 4 x (64 mm or 89 mm) members, in order to hold  the required nails without splitting.

Where the needed strength cannot  be reliably achieved using site-con- struction methods, factory-fabricated  panels made of wood or steel com- ponents may be used (Figure 5.38).  Shear walls subject to high forces may also require hold-downs to prevent the  walls from pulling up off the foundation or floor platform (Figures 5.39-5.41). Consultation with a structural engineer is recommended (and often  legally required) when building in areas that are earthquake-prone or subject to very high wind forces.

Sheathing panels made from wood or paper fiber, plastic foam, and glass fiber are intended principally as  thermal insulation and to provide a base for water-resistant building paper or house wrap. Most panels of these types are nonstructural, so walls sheathed with such panels rely on  letin diagonal bracing or strategically located structural panels for lateral force  resistance. Let-in bracing may be made  of wood members, such as 1 x 4 (19 x 89 mm) boards, or light steel members that are recessed into the outer  face of the studs of the wall before it is sheathed (Figures 5.32 and 5.42).

Figure 5.39
Strap tie hold-downs are made of galvanized steel straps with hooked
or deformed ends cast into the concrete foundation wall (top). After
the wall is framed, the exposed length of strap may be nailed directly
to framing or, as seen here, nailed through the sheathing into the studs
or posts behind (bottom). The number, size, and spacing of nails used
to fasten the strap depend on the magnitude of the loads that must be
resisted and the capacity of the wood member to hold nails without
splitting. In the top image, anchor bolts cast into the top of the foun-
dation wall that will be used to secure the sill plate in place are also
visible.

Figure 5.40
Hold-downs made from threaded rod and steel plate
anchors can resist much greater forces than strap tie
hold-downs. They may be used at each floor level to
securely tie the full height of the building frame to its
foundation. For the type shown here, the nuts at the
ends of the threaded rods may require retightening
after the fi rst heating season to compensate for wood
shrinkage, which can mean that access holes must be
provided through the interior wall surfaces. Other
models rely on spring-loaded tapered shims or other
mechanical compensation so as to be self-adjusting
Figure 5.41
A heavy-duty seismic hold-down similar to that illustrated in Figure 5.40. The anchor
rod with one end cast into the concrete foundation wall protrudes through the
preservative-treated wood sill where its threaded end is bolted to the anchor. The
anchor in turn is bolted to a 4 4 (89 89 mm) post with fi ve bolts of substantial
diameter. A conventional foundation anchor bolt with an oversized square washer is
also partially visible to the right of the hold-down. Also note the thicker-than-normal,
3-inch nominal (64-mm) sill plate, a common feature in wood light framing designed
for high seismic forces.
Figure 5.42
Applying a panel of insulating foam sheathing. Because this
type of sheathing is too soft and weak to brace the frame,
diagonal bracing is inserted into the outside faces of the
studs at the corners of the building. Steel bracing, nailed at
each stud, is used in this frame and is visible just to the right
of the carpenter’s leg.

FLOOR FRAMING AND BRIDGING

Floor framing (Figure 5.19) is laid out in such a way that the ends of un-cut 4-foot by 8-foot (1.2-m by 2.4-m) subflooring panels will fall directly over joists; otherwise, many panels will have to be cut, wasting both materials and time. Standard joist spacings are 16 or 24 inches o.c. (406 or 610 mm o.c.; o.c. stands for on  center,  meaning that the spacing is measured from center to center of the joists). Though less common, a joist spacing of 19.2 inches (486 mm) can also be used. Any of these spacings automatically provides a joist to support each end of every 8-foot (2.4-m) panel (Figure 5.23).


Figure 5.19
Step Three in erecting a typical platform frame building: the ground- floor platform.
Compare this drawing with the framing plan in Figure 5.17. Notice that the direction of
the joists must be changed to construct the cantilevered bay on the end of the building. A
cantilevered bay on a long side of the building could be framed by merely extending the  floor joists over the foundation.
Figure 5.23
Installing floor joists. Blocking will be
inserted between the joists over the two
interior beams to prevent overturning of
the joists.

Wood composite I-joists or manufactured trusses are frequently used in place of solid wood joists. Their advantages include the ability to span greater distances, straightness  and uniformity, and reduced drying  shrinkage of the floor  platform. These joist types are most frequently  spaced at 19.2 or 24 inches o.c. (488  or 610 mm o.c.) I-joists, with their thin webs, often require reinforcing where concentrated loads occur,  such as at joist ends, at cantilevers, or where interior loadbearing partitions bear on the joists (Figures 5.44 and 5.45).

Figure 5.44
Alternative details to those shown in Figure 5.43 for a fl oor framed with I-joists rather than solid lumber. For clarity,
the web of the I-joist is rendered light gray and blocking with a darker shade. The web stiffener shown in A is cut
slightly shorter than the height of the web of the joist, and is installed so that a small space remains between the
top of the blocking and the underside of the top fl ange. This prevents the blocking from prying the fl anges apart if
the I-joist itself shrinks or is compressed slightly (see also Figure 5.45). The I-joist blocking panel in B-1 is exactly
analogous to the solid blocking shown in Figure 5.45 B. A squash block is shown in B-2. This is a short section of
2x (38-mm) framing, installed vertically like a very short stud on either side of the I-joist. Squash blocks are used
under points of concentrated load, such as under loadbearing posts or studs on either side of a large opening in
a wall above. They are cut slightly longer than the full height of the joist to ensure that the loads are transmitted
through the blocks and not the joist

Figure 5.45
Blocking where an I-joist frames into a
glue-laminated wood beam, as illustrated
in Figure 5.44A. This blocking acts as
a web stiffener and also prevents the
I-joist from rotating within the metal
hanger, which is not tall enough to
restrain the upper fl ange of the joist.
The need for blocking depends on the
size of the I-joist, the magnitude of the
loads, and the type of hanger used.

After floor framing is complete, subflooring is fastened in place. To reduce squeaking in the finished floor and to increase floor  stiffness, adhesive may be used in conjunction with mechanical fasteners (Figures 5.26 and 5.27). Deformed shank nails or screws, either of which hold subflooring more securely than common nails, also contribute to the prevention of squeaks. Plywood and OSB panels must be laid with  the grain of their face layers perpendicular to the direction of the joists because these panels are considerably stiffer in this orientation (that is, a standard 4-foot by 8-foot (1.2-m by 2.4-m) panel should be laid with its  longer dimension perpendicular to the joists). Sheathing and subflooring panels are normally manufactured  1 /8  inch (3 mm) short in each face dimension so that they may be spaced slightly apart at all their edges  to prevent floor buckling during construction from the expansion of storm-wetted panels. Bridging, consisting of solid blocking or wood or metal crossbracing inserted between joists at  midspan or at intervals not exceeding  8 feet (2.4 m), is a traditional feature of floor framing (Figures 5.19, 5.28). (The term blocking refers, in general, to short lengths of lumber inserted between framing members for any  of a variety of purposes, such as bracing, reinforcing, or providing solid backing where fasteners are required for attachment of finish materials or equipment.) Its function is to hold the joists straight and to help them  share concentrated loads. The International Residential Code requires bridging only for joists deeper than 2 x 12 feet (38 x 286 mm). In better-quality construction, however, bridging is frequently used in all floors, regardless of depth, to improve stiffness and reduce vibration. Solid blocking is also required wherever floor joists span continuously across supporting beams to resist overturning of the joists (Figure 5.18B, D).

Where the ends of joists butt into supporting headers, as around stair openings and at changes of joist di- rection for projecting bays, end nails and toe nails cannot transfer the full  load between members, and sheet  metal joist hangers must be used. Each hanger provides a secure pocket  for the end of the joist and punched holes into which a number of special short nails are driven to make a safe connection.

Figure 5.26
Applying OSB subfl ooring. Note that
the longer dimension of the panel runs
perpendicular to the joist framing.

Figure 5.27
For a stiffer, quieter fl oor, subfl  ooring
should be glued to the joists. The
adhesive is a thick mastic that is
squeezed from a sealant gun on the tops
of the joists just before the subfl  ooring
is laid in place.

Figure 5.28
Bridging between joists may be
solid blocks of joist lumber, wood
crossbridging, or, as seen here, steel
crossbridging. During manufacture, the
thick steel strip is folded across its width
into a V- shape to increase its stiffness.
Steel crossbridging with one end toothed
requires only one nail per piece and
no cutting to size, so it is the fastest to
install.
Figure 5.18
Ground-fl oor framing details, keyed to the lettered circles in Figure 5.19. A
compressible or resilient sill sealer strip should be installed between the sill and the
top of the foundation to reduce air leakage but is not shown on these diagrams. Using
accepted architectural drafting conventions, continuous pieces of lumber are drawn
with an X inside and intermittent blocking with a single diagonal. The metal termite
shield in detail C is used in areas where the risk of termite infestation is high. It
prevents subterranean termites from traveling undetected from cracks in the concrete
into the wood framing above.

Attaching the Frame to the Foundation

The foundation sill plate, usually made of preservative-treated wood for added resistance to insects and moisture, is bolted to the foundation as a base for the wood framing (Figure 5.18,  A, B, and C). A single sill, as shown in the details here, is all that is required by code, but in better-quality  work, the sill may be doubled or made from thicker stock for greater stiffness. A thicker sill plate may also  be required in areas of high seismic risk, to provide a stronger connection between the wood framing and  the foundation anchor bolts. Because the top of a foundation wall is usually somewhat uneven, the sill may  also be shimmed up at low spots with wood shingle wedges or plastic shims to provide a more level, even base  for subsequent framing. A  sill sealer, made of compressible or resilient  material, should be inserted between  the sill and the foundation to reduce air infiltration through the gap. Some  sill sealer materials also discourage  moisture wicking up from the foundation into the wood framing (Figure 5.22). Conventional anchor bolts  are sufficient to hold most buildings on their foundations, but tall frames or those subject to high winds  or strong earthquakes may require more elaborate attachments (Figures 5.39-5.41).

Figure 5.22 Carpenters apply a preservative-treated wood sill to a sitecast concrete
foundation. A strip of compressible glass fiber sill sealer has been placed on the
top of the concrete wall, and the sill has been drilled to fit over the projecting
anchor bolts. Before each section of sill is bolted tightly, it is leveled as necessary
with wood shingle or plastic shims between the concrete and the wood. As
the anchor bolts are tightened, the sill sealer squeezes down to a negligible
thickness. A length of bolted-down sill is visible at the upper right. The
basement windows were clamped into reusable steel form inserts and placed in
the formwork before the concrete was cast. After the concrete was cast and the
formwork was stripped, the steel inserts were removed, leaving a neatly formed
concrete frame around each window. A pocket in the top of the wall for a steel
beam can be seen at the upper left.
Figure 5.39 Strap tie hold-downs are made of galvanized steel straps with hooked
or deformed ends cast into the concrete foundation wall (top). After
the wall is framed, the exposed length of strap may be nailed directly
to framing or, as seen here, nailed through the sheathing into the studs
or posts behind (bottom). The number, size, and spacing of nails used
to fasten the strap depend on the magnitude of the loads that must be
resisted and the capacity of the wood member to hold nails without
splitting. In the top image, anchor bolts cast into the top of the foun-
dation wall that will be used to secure the sill plate in place are also
visible.
 
Figure 5.40 Hold-downs made from threaded rod and steel plate
anchors can resist much greater forces than strap tie
hold-downs. They may be used at each fl oor level to
securely tie the full height of the building frame to its
foundation. For the type shown here, the nuts at the
ends of the threaded rods may require retightening
after the fi rst heating season to compensate for wood
shrinkage, which can mean that access holes must be
provided through the interior wall surfaces. Other
models rely on spring-loaded tapered shims or other
mechanical compensation so as to be self-adjusting.
Figure 5.41 A heavy-duty seismic hold-down similar to that illustrated in Figure 5.40. The anchor
rod with one end cast into the concrete foundation wall protrudes through the
preservative-treated wood sill where its threaded end is bolted to the anchor. The
anchor in turn is bolted to a 4 4 (89 89 mm) post with fi ve bolts of substantial
diameter. A conventional foundation anchor bolt with an oversized square washer is
also partially visible to the right of the hold-down. Also note the thicker-than-normal,
3-inch nominal (64-mm) sill plate, a common feature in wood light framing designed
for high seismic forces.

BUILDING - ERECTING THE FRAME

The erection of a typical platform  frame (referred to, imprecisely, as  rough carpentry in the architectÕs specifications) can best be understood by following this post s sequential  isometric diagrams, beginning with  Figure 5.19. Notice the basic simplici- ty of the building process: A platform  is built on top of the foundation.  Walls are assembled horizontally on the platform and tilted up into place.

Another platform or a roof is built on top of the walls. Most of the work is accomplished without the use of ladders or scaffolding, and temporary  bracing is needed only to support the walls until the next level of framing is  installed and sheathed.

The details of a platform frame  are not left to chance. While there  are countless regional and personal  variations in framing details and techniques, the sizes, spacings, and  connections of the members in a  platform frame are standardized  and closely regulated by building  codes, even down to the size and  number of nails for each connection (Figure 5.21) and the thicknesses and nailing patterns of the sheathing panels.

Figure 5.19
Step Three in erecting a typical platform frame building: the ground- fl oor platform.
Compare this drawing with the framing plan in Figure 5.17. Notice that the direction of
the joists must be changed to construct the cantilevered bay on the end of the building. A
cantilevered bay on a long side of the building could be framed by merely extending the floor joists over the foundation.

Figure 5.20
Alternative ways of constructing
an interior line of support for
ground-fl oor joists. Space is
left over the tops of the beams
in B and D to allow for drying
shrinkage in the joists.

Figure 5.21
Platform framing members are fastened according to this nailing schedule, which framing carpenters know by memory and which  is incorporated into most building codes and construction standards.

BUILDING - PLANNING THE FRAME

An experienced carpenter can frame a simple building from the most minimal drawings, but the framing for a  larger or custom-designed structure may need to be planned as carefully as for a steel- or concrete-framed building (Figure 5.16). The architect or engineer determines an effcient layout and the appropriate sizes for joists and rafters, and communicates this information to the carpenters by means of  framing plans (Figures 5.17 and 5.51). For most purposes, member sizes can be determined using standardized structural tables that are part of residential building codes, or, for more complex framing or special conditions, custom engineering may be required. Larger-scale  section details, similar to those seen throughout this chapter, are prepared for major connections in the building system. The architectural floor plans serve to indicate the locations and dimensions of walls, partitions, and openings, and the exterior elevations show the outside faces of the building, with vertical dimensions or elevations indicated as required. For most buildings,  building sections are also drawn that cut completely through the building, showing the dimensional relation- ships of the various floor levels and roof planes and the slopes of the roof surfaces.  Interior elevations are often prepared for kitchens, bathrooms, and other rooms with elaborate interior features.

Figure 5.16 A floor plan and building section are
two important components of the
construction drawings for a simple
house with wood light framing. The
ground floor is a concrete slab on grade.

Figure 5.17
A framing plan for the ground-floor platform
of the building
Figure 5.51

FOUNDATIONS FOR LIGHT FRAME STRUCTURES

Foundations for light framing, originally made of stone or brick, are  now made in most cases of sitecast  concrete or concrete block masonry  (Figures 5.5-5.11). These materials  are highly conductive of heat and  usually must be insulated to meet  code requirements for energy con- servation (Figures 5.8, 5.9, 5.12, and  5.13). Where concrete and masonry  construction methods are not practical, such as in extremely cold regions, foundations may be constructed entirely of preservative-treated wood  (Figures 5.14 and 5.15). Such  permanent wood foundations can be con- structed in any weather by the same crew of carpenters that will frame the building; they are readily insulated in the same manner as the frame  of the house they support; and they easily accommodate the installation of electrical wiring, plumbing, and interior finish materials.

Figure 5.5
Step One in the construction of a simple platform frame building:
establishing the position, shape, and size of the building on the site.
After the corners of the foundation have been staked, batter boards are
erected safely beyond the limits of the excavation area. String lines
crossing over the corner stakes are stretched from the batter boards,
and their positions on the boards are preserved with notches or nails
in the boards. Later, after excavation, the strings are stretched again,
and the foundation corners can be relocated at the bottom of the
excavation. This drawing begins a series of isometric drawings that
will follow the erection of a wood light frame building step by step
throughout the course of this chapter.

Figure 5.6
Typical details for a sitecast concrete
foundation and basement for a platform
frame building. Details A, B, and C are
keyed to the circled portions of the
drawing in Figure 5.7.
Figure 5.7
Step Two in the construction of a typical
platform frame building: excavation and
foundations. The letters A, B, and C indicate
portions of the foundation that are detailed
in Figure 5.6.

Figure 5.8
Most building codes require thermal insulation of the foundation. These are three different ways of adding insulation to a  cast-in-place concrete or concrete masonry basement and one way of insulating a crawlspace foundation. The crawlspace may  alternatively be insulated on the outside with panels of plastic foam. The interior batt insulation shown in B is commonly used but  raises questions about how to avoid possible problems arising from moisture accumulating between the insulation and the wall.
Figure 5.9
Some typical concrete slab-on-grade details with thermal insulation. In areas where termites are common,
there must be a metal fl ashing (termite shield) similar to that shown in Figure 5.18 C or other interruption
that passes through the foam insulation above ground level to prevent termites from tunneling undetected
through the insulation to reach the wood structure. This applies to the foam-insulated basement details in
Figure 5.8 as well.

Insulating  concrete formwork (ICF) foundation  systems using permanent insulating  forms are easy to construct, eliminate the need for formwork removal, and provide integral insulation  (Figure 14.12).  Proprietary  precast  concrete foundation systems relying on factory-fabricated reinforced  concrete panels are rapidly erected  on site and can be used to construct  basement structures of consistent  strength and quality. They may be  manufactured with insulation integral to the precast panel or designed  to readily accept insulation added in  the field.

All basements also need to be carefully dampproofed and drained  to avoid flooding with groundwater
and to prevent the buildup of water pressure in the surrounding soil  that could cause the walls to cave in  (Figures 5.6, 5.7, and 5.11).

Figure 5.10
Erecting formwork for a sitecast concrete foundation wall. The footing has already
been cast and its formwork removed. It is visible in front of the worker at the left.
Figure 5.11
Masons construct a foundation of
concrete masonry. The fi rst coat of
parging, which is portland cement
plaster applied to help dampproof the
foundation, has already been applied
to the outside of the wall, and the
drainage layer of crushed stone has
been backfi lled in place. The projecting
pilaster in the center of the wall will
support a beam under the center of
the main fl oor. After a second coat of
parging, the outside of the foundation
will be coated with an asphaltic
dampproofi ng compound. (Reprinted with
permission of the Portland Cement Association
from Design and Control of Concrete
Mixtures, 12th edition; Photos: Portland
Cement Association, Skokie, IL)
Figure 5.12
A concrete masonry foundation with polystyrene foam insulation applied to its outer
surface.
Figure 5.13
Following completion of the exterior
siding, a worker staples a glass fi  ber
reinforcing mesh to the foam insulation
on the exposed portions of the basement
wall. Next, he will trowel onto the mesh
two thin coats of a cementitious, stucco-
like material that will form a durable
fi nish coating over the foam.
Figure 5.14
Erecting a permanent wood foundation.
One worker applies a bead of sealant
to the edge of a panel of preservative-
treated wood components as another
prepares to push the next panel into
position against the sealant. The panels
rest on a horizontal preservative-treated
plank, which, in turn, rests on a drainage
layer of crushed stone. Wood founda-
tions can be constructed in any weather
and can be insulated in the same way
as the superstructure of the building. 



Figure 5.15
The difference in color makes it clear
where the preservative-treated wood
foundation leaves off and the untreated
superstructure of the building begins.