GENERAL CONTRACTOR AND PROJECT DELIVERY METHODS
• Design-bid-build method
• Design-negotiate-build method
• Construction manager as agent method
• Construction manager at risk method
• Design-build method
• Integrated project delivery method
The design-bid-build method is the oldest and most familiar method of project delivery. This method is covered first. Because the essential features of construction and postconstruction phases are almost identical in all delivery methods, a discussion of what is included in these two phases is presented next. Subsequently, other methods are discussed in terms of how they differ from the design-bid-build method. The table “Project Delivery Methods at a Glance” provides a synopsis of these methods.