Backfilling - Construction
In some situations, especially in backfilling utility trenches under road- ways and floor slabs, settling can be virtually eliminated by backfilling with controlled low-strength material (CLSM), which is made from portland cement and/or fly ash (a byproduct of coal- burning power plants), sand, and water. CLSM, sometimes called “flowable fill,” is brought in concrete mixer trucks and poured into the excavation, where it compacts and levels itself, then hardens into soil-like material. The strength of CLSM is matched to the situation:
For a utility trench, CLSM is formulated so that it is weak enough to be excavated easily by ordinary digging equipment when the pipe needs ser-vicing, yet as strong as a good-quality compacted backfill. CLSM has many other uses in and around foundations.
It is often used to pour mud slabs, which are weak concrete slabs used to create a level, dry base in an irregular, often wet excavation. The mud slab serves as a working surface for the reinforcing and pouring of a foundation mat or basement floor slab and is often the surface to which a waterproofing mem- brane is applied. CLSM is also used to replace pockets of unstable soil that may be encountered beneath a sub- structure or to create a stable volume of backfill around a basement wall.
0 comentarios:
Post a Comment