Up–Down Construction
In such a case, up–down construction is sometimes an economical option, even if its first cost is somewhat more than that of the normal procedure, because it can save considerable construction time.
As diagrammed in Figure 2.69, up–down construction begins with installation of a perimeter slurry wall.
Internal steel columns for the substructure are lowered into drilled, slurry-filled holes, and concrete footings are tremied beneath them. After the ground floor slab is in place and connected to the substructure columns, erection of the superstructure may begin. Construction continues simultaneously on the substructure, largely by means of mining machinery: A story of soil is excavated from beneath the ground floor slab and a level mud slab of CLSM is poured.
Working on the mud slab, workers reinforce and pour a concrete structural slab for the floor of the topmost
basement level and connect this floor to the columns. When the slab is sufficiently strong, another story of soil is removed from beneath it, along with the mud slab. The process is repeated until the substructure iscomplete, by which time the super-structure has been built many storiesinto the air.
![]() |
| Figure 2.69 Up–down construction. |